Upcoming Onware webinar: Request for Information (RFI)

RFI Workflow – Contractor’s perspective

Are you a Contractor who wants to learn more about RFI’s within Onware?  Join this webinar to learn:
  • Creating and completing an RFI – walk through and best practices
  • How to view status of the RFI I sent?
  • When does the RFI get sent back to me?
15-20 minute webinar followed by 10 minutes Q&A session

When: May 1 @ 10 am

Please RSVP to support@onware.ca Connection details will be provided when RSVP has been received

 

RFI Workflow – Prime Consultant’s perspective

As a Prime Consultant, do you have questions on how Onware handles the RFI Workflow?  Join this webinar to learn:
  • When am I informed of an RFI?
  • Can I change how or when I’m notified?
  • How can I tell which disciplines still require a response to an RFI?
  • How to return RFI to initiator (General Contractor)
  • How to direct RFI to other disciplines
10-15 minute webinar followed by 15 minutes Q&A session

When: May 8 @ 1 pm

Please RSVP to support@onware.ca Connection details will be provided when RSVP has been received

 

RFI Workflow – Consultant’s perspective

Are you a Sub-Consultant who wants a deeper understanding of how Onware manages RFI’s?  Join this webinar to learn:
  • How to respond to an RFI
  • Who can respond to an RFI
10-15 minute webinar followed by 15 minutes Q&A session

When: May 15 @ 2 pm

Please RSVP to support@onware.ca Connection details will be provided when RSVP has been received

*** Please see  GoToMeeting_Attendee_QuickRef_Guide for Goto Meeting assistance ***  

Details of 7.8 release

Below are the details of the Onware 7.8 release

NEW FUNCTIONALITY

Shows thumbnails for uploaded attachments (size is standardized to 150 x 150 pixels)
  • NOTE: Thumbnails will not display in all areas of Onware; will be implemented in a phased approach
  • Thumbnail will display “preview not available” when it cannot provide a preview of the image
Proposed Change Notice
  • Email Subscription for Feature: PCN; Status: Approved has been added
Unsolicited Change Request

FIXES

Site Visits
  • Images have been set to standard size (150 x 150 pixels)
Proposed Change Notice
  • Reported issue: PCN can be issued for Change Order without a contract selected
    • Fix: Must select a Contract when completing PCN before the “Issue for Change Order” or “Issue & Create Change Order” buttons will display
      • Ensures contract amounts calculations can be completed if/when PCN is used within the Change Order process
  • Approval breakdown
    • Reported issue: Removing an amount from an approval breakdown field and selecting “save” returned the amount into the field; the removal of the amount was reversed upon “save”
      • Fix: Removing an amount from an approval breakdown field will not be reversed when “save” is selected
Consultant Recommendation
  • Reported Issue: If Change Estimate setting is turned on, the Change Estimate were not mandatory fields and the CR could be issued without these fields completed
    • Fix: Change Estimate fields must be completed before the CR can be issued
  • Reported Issue: Receive error when attempting to delete Initiated CR
    • Fix: Error was due to the CR having an attachment, resolved so that when an Initiated CR is deleted, Onware first deletes the attachments before deleting the CR
Linked Documents
  • Updated error message to indicate a document must be selected before the “Attach” button can be selected
Cross Project reports
  • Reported issue: Filtering by type not working
    • Fix: Able to now filter by type
  • Reported Issue: Selecting “print” generates error
    • Fix: Can now generate a report by selecting “print”